Good evening.
I am facing a strange situation regarding MRP: it shows different behavior when background than of when running foreground. To be more specific:
MRP runs at plant 2900. There is a Production Order for the finished material. When MRP runs in background (transaction MDBT, variant 2900,
image 1) it does not plan all BOM materials (material 120800323 for example, image 2). But, when I run MRP from withing MD04 (MD02) procurement proposals are created (material 120070748 for example, image 3).
Has anyone of you come across this??? Any suggestions????
Thank you very much,
Nikos Giannopoulos
Image 1
Image 2
Image 3