Hello everyone,
I'm an user of old version of Crystal but have recently downloaded the demo version of Crystal Report 2013.
I'm looking for a way to include a horizontal "baseline" line to a sample bar graph that I've designed. This baseline is suppose to be like a target dollar amount to measure each monthly bar to see whether it has exceeded the target.
However, I cannot find this option anywhere on Chart Expert or the Templates.
Does such an option exist in Crystal Report? And if so, how do I find it and use it?
Thank you kindly,